HAWLETON 2024 - Vyznavači sportu měli čtvrtek 6. 6. 2024 vyznačen v kalendáři
Construction of a new impoundment structure on the Arc river designed to extract water for a weir-type hydroelectric power plant on the left bank. This hydraulic structure includes a fixed weir with a movable dam structure, fish pass and the hydroelectric power plant itself with four VLH type turbines.
Locality: Aiguebelle, Savoy
Country: France
Investor:
SH Aqua Bella, Avenue des Champs Elysées 140, 75008 Paris, France
Provided work:
Detail design for the technological part
Delivery and installation of the technological part of the rubber dam structure including engineering services
Construction contractor:
LEON GROSSE TP, Boulevard de Russie 10, 73100 Aix les Bains, France