Slavnostní zahájení významného investičního projektu – „Kalové hospodářství ČOV Brno – Modřice“
Characteristics: The purpose of the project was to reduce flood-level flow rates, limit movement of sediments and protected built-up areas in the municipality of Karlovice from the adverse effects of flood-level flows caused by local torrential rainfall to a level corresponding to the design flow rate of Qn = 33.5 m3/s.
Investor: Povodí Odry, státní podnik
Locality: Moravian-Silesian Region, the Kobylí stream
The reservoir transforms the outflow to the design PV100 na Qneš = 4.41 m3/s.
The project included a costly modification of the transport solution consisting in the abandonment and replacement of the existing road No. II/452.
Parameters of Flood-control reservoir Jelení:
Purpose of the basin: retention
Type of dam: earth-fill zonal
Dam height: 16 m
Volume of the dam body: 119.5 thousand m3
Max. basin volume: 865,000 m3
Work provided by AQUATIS:
Technical concept and all stages of design documentation
Contractor OHL ŽS, a.s. Metrostav, a.s. POHL cz, a.s.