Nové Heřminovy Dam

The documentation concerned a proposed technical solution to a concrete gravity dam located in a morphologically suitable profile upstream the municipality of Zátor, including all functional facilities, i.e. operation of the structure, modifications in the flood-prone area and linking the dam to the surrounding  landscape, facilities ensuring the functioning and operation of the dam, the operations centre and, last but not least, civil structures related to the project itself. 
The basic requirement for the reservoir was to transform flood flows and protection the area downstream the reservoir against floods. Other purposes of the reservoir were to improve flow rate in periods of low water flows and recreational and energy use.

Investor: Povodí Odry, státní podnik

Parameters:
Dam type: Concrete gravity dam
Length in the axis approx. 339 m
Dam crown elevation 396.50 m a.s.l.
Footing bottom elevation: 364.00 m a.s.l.
Height above the footing bottom (max): 32.5 m
Number of expansion blocks: 23
Spillway type: Fixed, uncontrolled, single level
Number of spillway sections: 5
Spillway crest elevation: 392.15 m a.s.l.
Spillway crest length (1 section): 13 m
Designed overflow height: 2.0 m
 
Work provided by AQUATIS:
Investment plan
Set of supporting studies 
Design documentation for the decision on the location of the construction