Štětí small hydroelectric power station (SHPP)
Investor: Energeia, o.p.s.
Locality: Štětí hydraulic structure (CZ)
Watercourse: Elbe
General contractor: Sdružení Metrostav a.s. a Zakládání staveb a.s.
New construction of a low-pressure small dam hydroelectric power station at the existing Štětí movable dam on the Elbe River in km
Parameters of the hydroelectric power station:
Turbo genset: 2 x direct flow Kaplan turbines in PIT design, with conversion to horizontal synchronous generator
Design flow rate: Q = 2 x 150 = 300 m3/s
Design gradient: H = 2,6 m
Installed power: P = 2 + 3.23 = 6.5 MW
Estimated average annual electricity generation:
E = 30 GWh/year
Work provided by AQUATIS:
Documentation for the building permit
Tender dossier
Detail design
Designer’s supervision
As-built documentation