Nové Heřminovy Dam

Investor: Povodí Odry, státní podnik

The project entitled "Measures on the Upper Opava, project preparation in the period of 2013 - 2016" included validation of the Nová Heřminovy Dam functional parts (lower outlets, spillways, cascade apron and stilling pond) in terms of flow capacities. The shape design of these structures validated by calculations was then used as a basis for part "C. Model research of functional parts of the Nové Heřminovy Dam - physical model".

We would love for you to connect with us

Contact information