WWTP Brno - Modřice, construction of secondary clarifiers
Investor: Brněnské vodárny a kanalizace, a.s.
Design of the construction of two secondary clarifiers in dedicated vacant land including connecting pipes and lines. The construction of two secondary clarifiers will increase the separation area and thus improve the efficiency of sludge separation in the secondary clarifiers. The project is implemented with the WWTP in continuous operation. Thanks to the technical design, most of the construction can be carried out without affecting the operation of the WWTP.
Parameters of secondary clarifier:
Clarifier diameter: 50 m
Clarifier depth at the edge: 5.3 m
Clarifier depth at the cone: 6.45 m
Design flow rate: Q = 0.703 m3/s
Work provided by AQUATIS:
Joint permit documentation
Detail design documentation