Implementation of measures in the Brno reservoir, qualitative model of the Svratka basin upstream the Brno hydraulic structure

 
Investor: Povodí Moravy, s.p., Municipality of the City of Brno, South Moravian Region
The project-related work conducted over almost 20 years included a number of stages - studies and qualitative models of the basin, analyzes and proposals for measures to be taken in the reservoir, designer supervision during implementation of a costly sets of measures aimed to improve water quality all the way to the evaluation of effectiveness and proposed variants of the the measure intensification (see the list below) . 
A number of measures to reduce eutrophication have been introduced and implemented in the reservoir itself, with the most efficient being the combination of aeration systems and precipitation of phosphorus using a coagulant at the inflow to the reservoir. The aeration system installed in the reservoir consists of 5 aeration and 15 mixing towers ensuring aeration and de-stratification of the water column. Based on a detailed analysis, they aeration towers will be replaced with stirring towers in stage IV and supplemented with another 4 towers to reach a total of 24 units.
 
Parameters:
Catchment area: 1,586 km2
Number of inhabitants 136,484 in 281 settlement units
Number of WWTPs 60
Total volume of the Brno hydraulic structure: 17.702 mil. m3
 
Work provided by AQUATIS:
• Proposals for measures for the Clean Svratka catchment project implementation
• Study of the Svratka Clean Basin 
• Feasibility study for implementing measures at the Brno hydraulic structure
• Application for financial support from OP ENV
• Tendering documentation
• Qualitative model of the Svratka basin upstream the Brno hydraulic structure
• Implementation of measures at the Brno hydraulic structure, stage I – designer supervision
• Implementation of measures at the Brno hydraulic structure, stage III - Evaluation of the effectiveness of measures and proposals for the sustainability of water quality
• Qualitative model of the Svratka basin upstream the Brno hydraulic structure- update
• Implementation of measures at the Brno hydraulic structure, stage IV - Proposal of variants of measure intensification, zoning permit and tender documentation.

We would love for you to connect with us

Contact information