Feasibility study of the irrigation system in the Hustopeče region

 
Investor: State Land Office
The feasibility study was a technical optional solution of three main irrigation lines, new Horní Bojanovice water reservoir and a number of related structures. The main content of the study was the assessment of available water resources in the given locality that can be used for the design of newly irrigated land, optimization of the irrigation pipeline routing including the location of pumping stations and regulating reservoirs and economic assessment of the irrigation system in terms of capital and operating expenditure. The area of interest includes 34 cadastral areas, which fall within the districts of Brno-venkov and Břeclav.
 
Parameters:
Technical design of the main irrigation pipelines with a length of about 40 km
Technical design of the Horní Bojanovice water reservoir with a total volume of 4.5 million m3
 
Work provided by AQUATIS:
Feasibility study
Notification according to Section 7 (6) of Act No. 100/2001 Sb., on Environmental Impact Assessment
 

We would love for you to connect with us

Contact information