Modification of the Hořín lock chamber

Investor: Directorate of Waterways of the Czech Republic
Location: Central Bohemian region, Vraňansko – Hořínský channel
Watercourse: Vltava
Contractor: Metrostav a.s.

Project description: The construction included complete reconstruction of both large chamber heads providing extension from 11 m to 12 m, modification of the bridge in the downstream lock head to serve as a lifting bridge ensuring a navigable depth and construction of a waiting area in the downstream mooring space.

Work provided by AQUATIS:
Zoning-permit documentation 
Water-management part building permit documentation
Water-management part detailed design 
Designer’s supervision
Water-management part as-built drawings

Photo source: Directorate of Waterways of the Czech Republic

 

We would love for you to connect with us

Contact information